European Commission 4 February 2025, COMMISSION STAFF WORKING DOCUMENT Third River Basin Management Plans Second Flood Hazard and Risk Maps and Second Flood Risk Management Plans Member State: Romania Accompanying the document REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT on the implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Third River Basin Management Plans Second Flood Risk Management Plans

Also known as

The document outlines Romania's compliance with the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC), detailing the country's River Basin Management Plans and Flood Risk Management Plans. It highlights Romania's governance structure for water management, the ecological and chemical status of surface and groundwater bodies, and the significant pressures affecting water quality, primarily from agricultural runoff and urban wastewater. Additionally, it emphasizes Romania's efforts in biodiversity conservation and climate change adaptation, alongside the need for improved public consultation and international cooperation in water management.AI

European Union · · · 04-02-2025

EUROPEAN COMMISSION Brussels, 4.2.2025 SWD(2025) 20 final COMMISSION STAFF WORKING DOCUMENT Third River Basin Management Plans Second Flood Hazard and Risk Maps and Second Flood Risk Management Plans Member State: Romania Accompanying the document REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT on the implementation of the Water Framework Directive (2000/60/EC) and the

Read the full text

This document is published by eur-lex.europa.eu.

Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.