European Commission 4 February 2025, COMMISSION STAFF WORKING DOCUMENT Third River Basin Management Plans Second Flood Hazard and Risk Maps and Second Flood Risk Management Plans Member State: Luxembourg Accompanying the document REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT on the implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Third River Basin Management Plans Second Flood Risk Management Plans
Also known as
The document outlines Luxembourg's compliance with the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC), detailing the country's river basin management and flood risk management plans. Key provisions include the characterization of surface and groundwater bodies, assessment of ecological and chemical statuses, and identification of pressures such as agricultural pollution and hydromorphological changes. Enforcement is managed by the Ministry of Environment, Climate and Biodiversity, with public participation integrated into the planning process, although reporting has faced challenges, particularly with electronic submissions.AI
European Union · · · Cited by 2 · 04-02-2025
EUROPEAN COMMISSION Brussels, 4.2.2025 SWD(2025) 35 final COMMISSION STAFF WORKING DOCUMENT Third River Basin Management Plans Second Flood Hazard and Risk Maps and Second Flood Risk Management Plans Member State: Luxembourg Accompanying the document REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT on the implementation of the Water Framework Directive (2000/60/EC) and the
Read the full text
This document is published by eur-lex.europa.eu.
Moonlit adds the citation network (2 references), article-level links and cross-references, which are available to search for free.
Sign in to Moonlit