General Court 25 September 2024, Case T-484/21: Judgment of the General Court of 25 September 2024 – Polskie sieci elektroenergetyczne v ACER (Energy – Internal market for electricity – Capacity calculation region – Core region – Adoption by ACER of the methodology for cost sharing of redispatching and countertrading – Determination of the threshold for legitimate loop flows – Article 16(13) of Regulation (EU) 2019/943)
Also known as
European Union · · · 25-09-2024
Official Journal of the European Union EN C series C/2024/6650 11.11.2024 Judgment of the General Court of 25 September 2024 – Polskie sieci elektroenergetyczne v ACER (Case T-484/21) (1) (Energy - Internal market for electricity - Capacity calculation region - Core region - Adoption by ACER of the methodology for cost sharing of redispatching and countertrading - Determination of the threshold
Read the full text
This document is published by eur-lex.europa.eu.
Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.
Sign in to Moonlit