Maharashtra Authority for Advance Ruling 20 August 2019, NO.GST-ARA-138/2018-19/B-89 Mumbai (1. GST Rate on the work of "Development of Infrastructure facility for Passenger Water Transport Terminal" at Nerul, Navi Mumbai awarded to M/s. AjwaniKarawal (JV).2. Will the activity fall under)
Also known as
India · · · 20-08-2019
1. GST Rate on the work of "Development of Infrastructure facility for Passenger Water Transport Terminal" at Nerul, Navi Mumbai awarded to M/s. AjwaniKarawal (JV).2. Will the activity fall under chapter heading 9954 (construction service) with serial no. 3(iv)(a) or 3(vi)(a) of the Notification No. 11/2017-Central Tax (Rate)?
Read the full text
This document is published by gstcouncil.gov.in.
Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.
Sign in to Moonlit