U.S. Circuit Court for the District of Southern Mississippi January 19, 1889 (Porterfield v. Bond)

Also known as

United States · · · 19-01-1889

Hill, J.

This issue is submitted upon petition, answer, and proofs, from which the following facts appear: That the petitioner is, and has been for many years, the owner of the lots described in the pleadings, and the improvements thereon, situated in the city of Vicksburg. That, for the consideration of $10,400 paid to her, she, before the injuries complained of, conveyed to the trustees for the Vicksburg & Meridian Railroad Company a right of way over said lots and property. That when this conveyance was made, and for some time thereafter, trains were only run to the bank of the river, and were of the usual weight, and were run at a slow rate of speed, which did no damage to the buildings and improvements of petitioner on these lots, but that since the road has been in the hands of the receiver, and operated by his employes, this portion of the road-lied has become a part of an extensive line of railroad, over which largo and heavy trains are drawn by large and heavy engines. That on the grounds of the petitioner the road is of an unusually steep grade, and makes a curvo; and that to ascend this part of the road it is necessary, with a heavy train, to increase the speed *392to much more than six miles an hour, — the speed limited by the statute of the state for trains on railroads passing through incorporated towns and cities. It is admitted by the answer, and shown by the proof, that the trains, both freight and passenger, pass over this part of the road at a much greater rate of speed than six miles per hour; but it is not shown that the speed is greater than necessary, unless there be a division of the trains, or a doubling of engines.

Read the full text

This document is published by courtlistener.com.

Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.