Supreme Court of Iowa January 26, 1898 (Frey-Sheckler Co. v. Iowa Brick Co.)
Also known as
United States · · · 26-01-1898
Waterman, J.
1
The plaintiff corporation agreed to make, and place in the brickmaking plant of defendant, at Des Moines, what is called a “Bucyrus dryer,” — a somewhat complicated machine, consisting of steam pipes, valves, trades, and. cars, and which, when set up in the building that was erected by defendant, was so attached and connected with it as to become a part of the structure.
Read the full text
This document is published by courtlistener.com.
Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.
Sign in to Moonlit