Supreme Court of Florida April 13, 1932 (Tapping v. McIntosh)
Also known as
United States · · · 13-04-1932
lead-opinion
Davis, J.
—It seems to me that the declaration in this case was sufficient to withstand a general demurrer such as was sustained by the trial judge.
The declaration sets out the terms of a building contract between plaintiff and McIntosh, the contractor. The contractor was to construct a building for plaintiff under the contract, plans and specifications, and the United States Fidelity and Guaranty Company became surety on a bond which was given by the contractor to save harmless the plaintiff in the event McIntosh failed to construct the dwelling in accordance with the plans and specifications attached to and made a part of the contract sued on.
A copy of the contract and specifications is made a part of the declaration. The declaration itself contains the following allegations:
“That said specifications further provide, among other things, that it was the intent of plaintiff and said McIntosh to obtain a sound, permanent and waterproof stucco covering of the outside of said buildings; that said buildings were completed by said McIntosh; that plaintiff, believing that said work had been done, and material furnished according to the true intent and purpose of said contract and specifications, paid said McIntosh in full for said material and labor; that the dwelling constructed under said contract and specifications was not constructed as
*717
specified, in that within sixty days after completion thereof, and after payment thereof in full, the stucco on the outside of said dwelling cracked in many places; said stucco was not sound nor permanent, nor w!
Read the full text
This document is published by courtlistener.com.
Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.
Sign in to Moonlit