Supreme Court of New Hampshire May 2, 1933 (Maltais v. Concord)
Also known as
United States · · · 02-05-1933
Branch, J.
The plaintiff was injured upon May 12,1928 through the caving in of a ditch then under construction by the defendant in the course of an extension of its water system. The ditch was approximately three feet wide at the top, two and one-half feet wide at the bottom, and five and one-half feet deep.
Read the full text
This document is published by courtlistener.com.
Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.
Sign in to Moonlit