Connecticut Superior Court August 3, 1949, File 72790 (Wilcox Realty Co. v. Savin Rock Park Co., Inc.)
Also known as
United States · · · 03-08-1949
QUINLAN, J.
It is difficult to see how this proceeding could be called such an emergency as to require chambers time in the summer, after plaintiff stood by until the structure was-erected. To be sure the locus is at a summer resort but there are involved issues which, if the office of a temporary injunction is in mind, does not warrant summary action.
Read the full text
This document is published by courtlistener.com.
Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.
Sign in to Moonlit