Court of Claims of Illinois November 26, 1952, No. 4300 (Tenboer v. State)
Also known as
United States · · · 26-11-1952
Schuman, C. J.
Complaint was filed herein by claimants on May 5, 1950 to recover for damages to property and loss of business by virtue of a highway improvement in front of their property, and an amended complaint was filed on September 28, 1950, in which the claim for damages for loss of business was eliminated.
The claimants, Cornelius E. Tenboer and Margaret E. Tenboer, husband and wife, are the owners of premises in the town of Union Grove, about three miles west of the City of Morrison in Whiteside County, Illinois, which have been used for many years as a place of business and residence of the claimants. The property was purchased by claimants in the year 1941. It adjoins the Chicago and Northwestern Railway right-of-way, and is immediately to the north of State Bond Issue Route No. 6, also known as U. S. Route No. 30.
On September 11, 1947, the State of Illinois began work on a project designated as State Bond Issue Route No. 6, Section 17-R-IVB. It consisted of a combination reinforced concrete and steel structure over the Chicago and Northwestern tracks. The center line of this structure extends in an east-west direction, south of the previous aligrment of State Bond Issue Route No. 6 through Union Grove.
On May 17, 1948, the State of Illinois began a project designated as State Bond Issue Route No. 6, Section 1. It consisted of an earth-fill leading to the bridge of the project of 17-R-IVB. These projects were completed on October 5, 1949, and September 21, 1949, respectively.
The grade crossing over State Bond Issue Route No. 6 at the Chicago and Northwestern Railway tracks was closed and barricaded on both sides of the tracks, and across the highway.
The face or front of claimants’ building is 30 feet north of the center line of the old pavement, and the center line of the old pavement is 76 feet north of the center line of the new pavement. The difference in elevation between the old and new pavements opposite the east end of claimants’ property is 25.
Read the full text
This document is published by courtlistener.com.
Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.
Sign in to Moonlit