United States Court of Claims June 3, 1959, No. 416-55 (Hooper Construction Co. v. United States)
Also known as
United States · · · 03-06-1959
BRYAN, District Judge, sitting by designation.
A contract for the construction for the United States of a levee in the Florida Everglades is the source of these three claims. The first involves the method of measurement of the levee embankment for computing the plaintiff’s compensation on the agreed price per cubic yard; the second, the recapture of liquidated damages charged for delay in the completion of the embankment; and the last, the right to rental for equipment while idle but held ready for the compaction of the levee earth. Adopting with a slight change the fact findings of the commissioner, we deny the claims.
On the first and third claims recourse was had to the administrative process furnished by the contract for resolution of disputes. The determinations were adverse to the plaintiff — either for want of merit or for tardiness of prosecution. In effect, denial there of the first claim, as will later appear, denied the second. None of the decisions is vulnerable as arbitrary, capricious, slighting procedural requisites or lacking in evidential support. Nor, as the further discussion will also establish, was any rejection legally offensive.
I. The point of the initial claim is that in ascertaining the cubical content of the embankment (the multiplicand to which the yardage unit price is applied) the Government did not include that part of the embankment comprised between the base of the levee — the ground exposed by the stripping of the land to receive the embankment — and the surface of the ground before the stripping. The contention of the United States is that according to the contract the measure for payment is the volume of the structure above “the natural ground surface”, that is, above the level of the ground as it existed before it was disturbed at all except for a survey.
The critical stipulation of the contract reads:
“1-07 Measurement and Payment. — a. Embankment. — This item shall be measured by the cubic yard in place in the levee.