Final judgment: This case presents the question of whether newly constructed seawalls, built and sold as part of residential subdivision lots by a builder-developer, enjoy the protection of an implied warranty of fitness? For the reasons set forth herein, the question is answered in the affirmative.

This action consists of five cases which were consolidated for trial. In addition to the main actions, there are third party claims, cross-claims and counter-claims. The status of the parties and their respective claims are discussed below. From the testimony and evidence presented at trial, the court makes the following —

Findings of fact

[substantial portions are omitted]

15) On January 14, 1974 there were unusually heavy rainstorms in the Boca Raton area. Some of the Carriage Hill lots had not been filled to grade and consequently the rain ran off into the below grade lots rather than into the storm drain. The intensified pressure behind the seawalls resulted in a dynamic collapse of the seawalls when the anchor tie-backs which had been improperly linked, pulled out of the concrete cap. From the expert testimony at trial, the court finds as a matter of fact that the seawall failure would not have occurred had the engineering design been adhered to by threading the tie-backs through the lifting eyes, by placing stirrups in the cap, and by providing sufficiently enlarged weep holes. With the possible exception of the weep holes, it should be noted that none of these conditions was visible to the ultimate purchaser at the time of purchase. The area of the cap where the tie-*76rod would have interconnected with the lifting bar and where the stirrup would have been placed, was fully encased in cement.

16) As a result of the negligent construction, two hundred and fifty feet of continuous seawall at Carriage Hill failed during the January 14th rainstorm.