Utah Supreme Court May 12, 1982, No. 17251 (Johnson v. Garkane Power Ass'n)

Also known as

United States · · · 12-05-1982

DURHAM, Justice:

This is an action to recover damages for the loss of the plaintiffs’ farm crop and planting and soil preparation costs for 1977. The plaintiffs’ claim is premised on the defendant’s alleged contractual obligation to provide the plaintiffs with real “three-phase” electric power by 1977. The district court denied the plaintiffs’ claim, holding that there was no contract, and awarded the defendant $8,883.53 on its counterclaim for power used. Plaintiffs appeal the dismissal of their action and the counterclaim award.

In 1974, plaintiffs had engineered an irrigation system to provide water for their farming operation near Tropic, Utah. The main pressurizing device for the system, a 100-horsepower pump, required “three-phase” electrical power for its most efficient and dependable operation. While real three-phase power was not available to plaintiffs’ farm in 1974, the defendant did provide an interim substitute, “V-phase, open delta” connected power. “Open delta” connected power provides less stable electrical service and normally requires derating of equipment to less than full capacity. Equipment failures from blown fuses are *745more common than with “real” three-phase power. Nonetheless, the “open delta” connected power provided adequate service through 1976.

The essence of the plaintiffs’ contractual claim is that the defendant had agreed to replace the interim “open delta” connection with real three-phase power on, or before, a specific date after 1974. Since damages were claimed only for 1977, we may reason that plaintiffs were required to show, in order to carry their burden of proof, that the defendant had agreed to convert electrical service for plaintiffs’ farm to real three-phase power by 1977. The trial court found that there was no such agreement. On appeal, plaintiffs make no claim that the law of contracts was incorrectly applied, but rather that the trial judge erred in the weight given to the evidence.

Read the full text

This document is published by courtlistener.com.

Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.