Court of Appeals of Arizona January 10, 1984, 2 CA-SA 001 (Forest City Dillon v. Super. Ct. in & for Pima)
Also known as
United States · · · 10-01-1984
*411
OPINION
HATHAWAY, Judge.
The sole issue raised in this special action is whether the trial court abused its discretion when it entered an order staying arbitration and denying an application to compel arbitration. We accept jurisdiction here because we conclude that the trial court’s denial of the application for arbitration is without precedent or support in the law and cannot be justified.
Western Waste Service Systems, Inc. v. Superior Court,
120 Ariz. 90, 584 P.2d 554 (1978).
Petitioner was the general contractor for the development of Tucson Mall, a regional shopping mall in Tucson. Respondent United Sheet Metal of Arizona, Inc., (U.S.M.) entered into a subcontract with petitioner to provide labor, material and services with respect to the heating, ventilation and air conditioning system for the project. Respondent United Pacific Insurance Company is the performance bond surety for U.S.M., and U.S.M. utilized respondents Wright, Marshall Trim Aire, Tenaire, Inc. and General Air Control as subcontractors for the project while respondent Hellmuth, Obata & Kassabaum was the architect for the project.
Petitioner alleges that U.S.M. failed to complete its subcontract in a timely manner and in keeping with standards of good workmanship. The contract entered into between petitioner and respondent U.S.M.