Tennessee Supreme Court July 1, 1985 (Washington County Board of Education v. MarketAmerica, Inc.)
Also known as
United States · · · 01-07-1985
OPINION
DROWOTA, Justice.
In this declaratory judgment action, the Washington County Board of Education seeks to have its contract with MarketAm-erica, Inc. declared null and void ab initio. The trial court granted the relief sought, on grounds the Plaintiff was without authority to enter into the contract in the first place. A divided Court of Appeals reversed, and we granted Plaintiff’s application for permission to appeal.
The dispositive issue in this lawsuit is whether a county school board has the statutory authority to enter into a contract which requires contract payments beyond the current fiscal year and which therefore would bind future school boards. The issue is one of importance to the fiscal affairs of local governments in Tennessee.
The contract at issue in the case at bar is a “Management Service Agreement” whereby Defendant MarketAmerica, Inc. agreed to provide a service that would purportedly reduce energy consumption in the Washington County School System. MarketAmerica installed computerized energy monitoring equipment in various school buildings which was designed to significantly reduce energy consumption and thereby result in significant cost savings to the Washington County School System. The Board of Education in turn agreed to pay a fixed sum monthly to MarketAmeri-ca, which was calculated as a fixed percentage of the amount of money saved by the school board as a result of lower utility bills. The billing procedure detailed in the contract was intended to insure that the Board of Education will pay to MarketAm-erica 55 per cent of the actual savings generated by the computerized monitoring system. MarketAmerica guaranteed that power bills would be reduced by at least 27 per cent over bills in a base period, with adjustments for changes in temperature and fuel costs. The period September 1981 through October 1982 was selected as the base period. During installation of the system, savings were to be shared on a 50/50 per cent basis.
Read the full text
This document is published by courtlistener.com.
Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.
Sign in to Moonlit