Appeal is taken from an order of the circuit court of Champaign County entering judgment in favor of the plaintiff, the Fountain Head Drainage District (District), and denying the motion for summary judgment of the defendant city of Champaign (city). Relying principally upon section 12 — 3 of the Illinois Drainage Code (Code) (Ill. Rev. Stat. 1985, ch. 42, par. 12 — 3), the court’s judgment order requires that the city seek and obtain the consent of the District before it may erect or replace any structure spanning District ditches within Champaign city limits. The judgment order further provides it is permissible for the District to condition such consent upon a court-approved agreement, which may include among its terms a “hold harmless” provision executed by the city in favor of the District. The city must also bear all costs associated with going into court to gain approval of the agreement. In the event accord cannot be reached, the city is ordered by the court to remove two footbridges already constructed.
Because we construe no statutory authority which would require a city to execute a hold harmless provision upon the reconstruction or rebuilding of an existing bridge, that being in conflict with the acknowledged duty of a municipality to maintain its public thoroughfares, we reverse. A strict interpretation of the relevant statutes likewise causes us to conclude a district may not withhold its approval to new construction by exacting certain court-approved conditions unrelated to the natural drainage flow in the area.
The focus of this controversy is on two existing footbridges constructed over drainage ditches within the city of Champaign. On May 29, 1986, the District filed suit for a mandatory injunction that the city remove both footbridges or, alternatively, for a declaratory judgment that the city must first obtain the District’s consent to erect footbridges across any ditch.
Read the full text
This document is published by courtlistener.com.
Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.
Sign in to Moonlit