United States Court of Federal Claims October 12, 1995, No. 94-570 C (Town of Floyd v. United States)

Also known as

United States · · · 12-10-1995

OPINION

HODGES, Judge.

Defendant moved to dismiss plaintiffs contract claim because it did not state the elements of an implied-in-fact contract. We grant defendant’s motion to dismiss.

Discussion

The Town of Floyd is a municipal corporation located near Griffiss Air Force Base in New York. While investigating the effects of de-icing chemicals used at the base, representatives of the Air Force and residents of the town discovered contamination in drinking water wells adjacent to the base. Until clean up of the site could be accomplished, the Air Force provided a grant of $500,000 to cover the design costs of extending existing water lines from the neighboring City of Rome to provide safe drinking water to the *172affected residents of the town. The Air Force also offered to pay its share of installing the alternative water system.

Plaintiff commissioned engineering designs and plans and solicited bids for the construction work, including the Charles Road and Davis Road areas now in dispute (Area B). Department of Air Force personnel reviewed and approved the designs, plans, and bid specifications. Meanwhile, the Air Force continued testing and analysis to determine the nature and extent of the contamination. Eventually, it set up a buffer zone of coverage, drawing boundaries beyond which the Air Force would not be responsible for water line construction. Consequently, the Air Force divided the Town of Floyd into four parcels — Areas A, B, C, and D — and limited funding for the water line installation costs to those portions of the town in which groundwater had been contaminated by the Air Force. The Air Force' determined that it had not contaminated Area B.

The Air Force entered into a contract with the City of Rome to extend that city’s water system to the contaminated areas of the Town of Floyd. Area B was not included in the contract. Despite defendant’s refusal to pay for Area B, plaintiff financed construction of the entire project.

Read the full text

This document is published by courtlistener.com.

Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.