Superior Court of Pennsylvania August 7, 1997, Nos. 00035 and 00036 (Lane Enterprises, Inc. v. L.B. Foster Co.)
Also known as
United States · · · 07-08-1997
lead-opinion
CIRILLO, President Judge Emeritus.
L.B. Foster Company (Foster) appeals from the order entered in the Court of Common Pleas of Bedford County.1 We reverse.
This appeal arises out of Itigation concerning an agreement between Foster, a manufacturer of steel bridge components and Lane Enterprises, Inc. (Lane), a company specializing in the coating of steel materials. In the spring of 1992, Foster agreed to sel Hammond Construction, Inc. (Hammond) various bridge components for use in the construction of a bridge in Summit County, Ohio. This agreement (the Hammond Agreement) specified that Foster was to supply the bridge components in two separate stages. The Hammond Agreement also stated that the bridge components were to be coated in accordance with the Ohio Department of Transportation (ODOT) specifica*468tions.2 Because Foster was not equipped to coat the bridge components that it manufactured, it sought an outside contractor, Lane, to perform the coating process. On September 23, 1992, Foster and Lane orally agreed that Lane would clean and coat the bridge components. The agreement was confirmed by Foster’s purchase order which specified that all cleaning and coating performed by Lane was to be in compliance with ODOT standard specifications for construction and materials and that Lane was not to ship any coated components without prior approval from an ODOT inspector (The Lane Agreement). In addition, reflecting Foster’s delivery obligations pursuant to the Hammond Agreement, the Lane Agreement provided that Lane clean and coat the bridge components in two separate stages, the first stage to be delivered in October of 1992 (Stage I) and the second stage in June of 1993 (Stage II). Pursuant to the Lane Agreement, Foster shipped Stage I of the uncoated bridge components to Lane’s facility in Carlisle, Pennsylvania for processing. Lane then commenced the cleaning and coating process for the Stage I components.
Read the full text
This document is published by courtlistener.com.
Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.
Sign in to Moonlit