South Dakota Supreme Court March 4, 1998, None (Border States Paving, Inc. v. State Ex Rel. South Dakota Department of Transportation)

Also known as

United States · · · 04-03-1998

GILBERTSON, Justice.

[¶ 1.] Border States Paving Corporation, a North Dakota paving construction company, appeals from the trial court’s denial of its motion for judgment notwithstanding thé verdict or, in the alternative, its motion for new trial after a jury verdict was returned in favor of the South Dakota Department of Transportation. We affirm.

FACTS AND PROCEDURAL HISTORY

[¶ 2.] On June 13, 1993, the South Dakota Department of Transportation (DOT) accepted a bid from Border States Paving, Inc. (Border States) on a contract for asphalt resurfacing of. a 12-mile portion of Highway 46 in Yankton County, South Dakota. The contract required Border States to mill off a portion of the old asphalt surface, place two layers or “lifts” of asphalt (one leveling course and one wearing course), and complete ' some painting and guardrail work. The bid and resulting contract specified the project to be completed on or before October 15, 1993, as this was the seasonal deadline established by DOT.

[113.] Border States was responsible for obtaining the aggregate materials needed for the paving project. Border States subcontracted ' with Weatherton Contracting (Weatherton), an aggregate crushing business, to provide the materials for the asphalt operation. DOT plans provided for the use of an optional materials pit, maintained by DOT, should Border States run into difficulty with its supply of materials. In the event the optional pit could not meet Border States’ needs, Border States was required to find ¿nother source. Due to heavy rains in 1993, Weathertori’s scale and the access road to the pit were flooded. Near the same time, the optional pit was also partially flooded which prevented Border States from receiving its materials from the optional pit. Weatherton later testified that the pit was not accessible until late August or early September 1993. As a result, Border States argued its completion of the project was delayed.

Read the full text

This document is published by courtlistener.com.

Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.