California Court of Appeal June 14, 2000, D032817 (Fraley v. Allstate Insurance Company)

Also known as

United States · · · 14-06-2000

Opinion

NARES, J.

In this insurance bad faith case, Ernest Fraley and Linda Fraley appeal a summary judgment in favor of Allstate Insurance Company (Allstate). The principal issue is whether a homeowners policy required the Fraleys to repair or replace their damaged property within 180 days of a certain date as a prerequisite to obtaining replacement cost. We conclude it did, and accordingly affirm the judgment.

Factual and Procedural Background

On May 17, 1994, a fire extensively damaged the Fraleys’ home. The loss was covered by their deluxe homeowners policy with Allstate. It provides in pertinent part:

“5. How We Pay For a Loss

“Building Structures

“Payment for covered loss to building structures insured under the Dwelling Protection coverage will be by one of the following methods:

“a) Replacement Cost. This means there will not be a deduction for depreciation. ft[| Payment will not exceed the smallest of the following amounts: 1) the replacement cost of that part of the building structure damaged for equivalent construction and use on the same premises; [1D 2) the amount actually and necessarily spent to repair or replace the damaged building structure; or HQ 3) the limit of liability applicable to the building structure.

“We will not pay more than the actual cash value of the damaged building structure until the repair or replacement is completed.

*1287

“b) Actual Cash Value. This means there may be a deduction for depreciation.

“If you do not repair or replace the damaged building structure, payment will be on an actual cash value basis, not to exceed the limit of liability shown on the declarations page for Coverage A—Dwelling Protection. You may make a claim for any additional payment on a replacement cost basis if you repair or replace the damaged building structure within 180 days of the actual cash value payment.”

1

Allstate promptly investigated the claim, but the parties’ contractors could not agree on the scope or cost of repair.

Read the full text

This document is published by courtlistener.com.

Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.