Court of Appeals for the Eighth Circuit November 5, 2002, 01-1777 (Hall Contracting Corporation v. Entergy Services, Inc.)
Also known as
United States · · · 05-11-2002
BEAM, Circuit Judge.
In this diversity action, Hall Contracting Corporation (“Hall”) appeals from the decision of the district court granting summary judgment in favor of Entergy Services, Inc. (“Entergy”). We affirm in part and reverse in part.
I. BACKGROUND
Entergy owns and operates the Remmel Dam on the Ouachita River near Hot Springs, Arkansas. Constructed in 1923, the dam is an “Amberson-style” gravity dam comprised of abutments on the north and south shores of the river and a spillway that spans the river and connects the two abutments. In 1996, Entergy solicited bids for a construction project designed to alleviate the Federal Energy Regulatory Commission’s concerns relating to the structural integrity of the dam. The project involved removing debris from and cleaning “cells” in all three sections of the dam, filling the hollow cells with rock and concrete, and placing “anchors” in the dam’s north abutment. Phase One of the project covered the debris removal and cleaning of the twenty-three spillway cells.
In preparation for submitting a bid on the project, Hall representatives toured and inspected the dam on at least two occasions. During those inspections, En-tergy informed Hall that each cell would need to be cleaned down to bedrock at approximately 245.5 feet above mean sea level (“MSL”). Entergy also informed Hall that the catwalk above the cells was 275.5 feet MSL. Thus, by measuring the distance from the catwalk to the debris in each cell and then by subtracting that figure from the height of the catwalk, one could estimate the amount of debris above 245.5 feet MSL. According to Hall-representative Raleigh Jones, Entergy representatives estimated that each cell probably contained two to three feet of water, mud, and silt. Jones dropped a tape measure into approximately five of the twenty-three spillway cells during one inspection, but did not inspect or measure the debris in the other eighteen cells.
Read the full text
This document is published by courtlistener.com.
Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.
Sign in to Moonlit