This matter came before the Court on a motion by the defendant, Walsh Construction Company of Illinois (“Walsh”), seeking summary judgment pursuant to Mass.R.Civ.P. Rule 56. The plaintiffs, the Massachusetts Highway Department and the Massachusetts Turnpike Authority (collectively “CA/Tj, oppose the motion.
BACKGROUND
For the purposes of Walsh’s motion, only limited background and procedural facts need be recited.
*16This is a construction claim arising out of work performed by Walsh on Public Construction Contract C05B1 (the “C05B1 Contract”) for the construction of the Tunnel Finishes between the South Boston and East Boston portals of the Ted Williams Tunnel (the “Tunnel”), as part of the Central Arteiy/Tunnel Project.
The original complaint was filed on December 14, 2001. The currently controlling pleading is the amended complaint, docketed on July 8, 2002.
CA/T charges Walsh with a breach of the C05B1 Contract. At least by June 30, 1997, CA/T was sufficiently aware of the acts of Walsh which it contends constitutes the breach.
There are material facts in dispute as to when, prior to June 30, 1997, Walsh finished its work, or was in a position of substantial completion. There is no dispute, however, that by November 30, 1995, Walsh’s total earned Contract value was 98.2% of the then-current total Contract value, or that the CA/T first opened the Ted Williams Tunnel for public use on December 15, 1995.
The amended complaint, in para. 10, recites that the “Plans and Specifications governing Walsh’s work under the C05B1 Contract imposed a variety of obligations on Walsh, including but not limited to the obligation to construct airtight plenums as part of the exhaust system.”
Certain portions of the Specifications to the C05B1 Contract implicated by the amended complaint read as follows, with all emphasis added:
3.02 INSTALLATION
F. Install panel doors complete with operating hardware and gasket seals as indicated.
Read the full text