United States Bankruptcy Court, D. Delaware March 28, 2006, 15-11858 (In Re Hayes Lemmerz International, Inc.)
Also known as
United States · · · 28-03-2006
OPINION
1
MARY F. WALRATH, Bankruptcy Judge.
Before the Court are the applications of General Electric Capital Corporation (“GECC”) for allowance and payment of an administrative expense for damages allegedly sustained to machines it leased to Hayes Lemmerz International, Inc. (“Hayes”). After trial and briefing, the Court will grant the applications in part.
I.
BACKGROUND
On December 5, 2001 (the “Petition Date”), Hayes and several of its affiliates (collectively, the “Debtors”) filed voluntary petitions for relief under chapter 11 of the Bankruptcy Code. Prior to the filings, the Debtors were suppliers of wheels and other automotive components (e.g., brakes, drums, and rotors) to original equipment manufacturers. As automotive wheel suppliers, the Debtors manufactured, designed, and distributed cast aluminum and fabricated wheels. On May 14, 2003, the Court confirmed the Debtors’ Joint Plan of Reorganization, which became effective on June 3, 2003.
Prior to the Petition Date, Hayes and GECC had entered into a Master Lease agreement, with amendment, dated December 28, 1992, and an addendum dated October, 15, 1993 (collectively “the Master Lease”), whereby GECC leased various computer numerically controlled (“CNC”) machines (the “Machines”) to Hayes. The Machines are metal-cutting machine tools used to shape the wheel (e.g., lathes) and to produce lug and valve holes in the wheel (e.g., drills). Each Machine is controlled by a central computer programmed in advance and is capable of making precision parts repeatedly. Machine operating performance is critical because wheels must be produced at precise specifications and tolerances.
In accordance with the Master Lease, various Schedules were subsequently executed between the parties pertaining to specific Machines.
2
The Machines were used by Hayes at six of its manufacturing plants.
Shortly after the Petition Date, Hayes rejected some of the Schedules of the GECC Machines.
Read the full text
This document is published by courtlistener.com.
Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.
Sign in to Moonlit