DECISION This case was tried before the Court, jury-waived.1 Fiore Concrete Products, Inc. ("Fiore") produced and supplied manholes pursuant to a contract with Defendant, John Rocchio Corporation ("Rocchio"). Rocchio failed to pay for all of the manholes which were supplied, and claimed some were defective. At trial, Fiore established an amount due of $26,542.73, after several returns and other credits. Findings of Fact Mr. John Rocchio, the president of the Defendant Corporation, established that his company entered into contract to purchase a quantity of manholes2 for several sewer projects his company had undertaken in Warwick and nearby communities. He acknowledged that the company received manholes from Fiore which were not paid for. For these deliveries, Rocchio received invoices totaling $26,542.73, which were never paid.3 Mr. Rocchio alleged these *Page 2 invoices were for defective products, although some were installed and some were discarded. When Rocchio failed to make timely payment, Fiore filed claims against the surety bonds written by RLI Insurance Company. These bonds were posted to protect the interests of the local community for liability for loss in the construction of the sewer projects. Mr. Antonio Duarte, the foreperson for Rocchio on a Conimicut project in Warwick, visually inspected each of the manholes upon delivery from Fiore, returning those he discovered to be defective on receipt. Those returned manholes were removed from the billings and are not at issue for this trial. All other manholes were installed, one at a time. Most of the deliveries were made in September and October, 2002. Mr. Duarte explained that there was a problem with the first manhole installed as it did not close properly. As the installation continued, he did not see the mastic (a sealant) seep out as the boots (connection joints to other pipes) were connected. He informed Mr. Rocchio who instructed Mr.

Read the full text

This document is published by courtlistener.com.

Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.