Appellate Division of the Supreme Court of the State of New York April 26, 2012 (Garcia v. 225 East 57th Street Owners, Inc.)
Also known as
United States · · · 26-04-2012
OPINION OF THE COURT
Catterson, J.
In this personal injury action in which the plaintiff alleges a violation of Labor Law § 241 (6), the critical inquiry is not whether the plaintiff was engaged in the demolition or “dismantling” of a structure. Rather, we must decide if the breaking of a mirrored panel that injured plaintiff is the type of hazard contemplated by the Industrial Code provisions that plaintiff alleges were violated.
The following facts are undisputed: The plaintiff Carlos Garcia was employed by nonparty JMPB Enterprises, LLC as a laborer. The defendant owns a 22-story cooperative apartment building in Manhattan and contracted with JMPB to remove wall coverings including mirrored wall panels. JMPB was then to plaster, prime, and paint the walls.
The two-by-eight-foot panels were affixed to the surface of the walls with adhesive. The plaintiff removed the panels by wedging a spatula between the panel and the dry wall. The plaintiff then tapped the spatula with a hammer to pry the panel loose. Several of the panels had broken while being removed. On January 16, 2007, the plaintiff was injured when a piece of panel he was removing broke and cut his hand.
The plaintiff commenced this action on April 23, 2007, alleging common-law negligence and violations of the Labor Law. After discovery, the defendant moved for summary judgment seeking dismissal of the complaint. In a decision and order dated March 10, 2011, the motion court granted summary judgment dismissing the Labor Law §§ 200 and 240 (1) and common-law negligence claims and the Labor Law § 241 (6) claim based on *9012 NYCRR 23-1.7 (e) (1) and (2) and an alleged OSHA violation, and denied that part of the motion seeking dismissal of plaintiffs section 241 (6) claim insofar as it was based on 12 NYCRR 23-3.3 (b) (3) and (c) on the ground that the plaintiff raised a triable issue of fact as to whether the work being performed on the premises was demolition.