Louisiana Court of Appeal December 17, 2015, No. 2015 CA 0008 (Accusess Environmental, Inc. v. Walker)

Also known as

United States · · · 17-12-2015

lead-opinion

GUIDRY, J.

| gPlaintiff, Accusess Environmental, Inc. d/b/a/ Discountpermit.com (“Accusess”), filed suit against the defendant, Dr. Mar-geaux1 Walker, to recover a debt. The trial court granted summary judgment in favor of Accusess, and Dr. Walker appealed. Accusess has filed an answer to the appeal seeking additional attorney fees. *72For the following reasons, we reverse, and we deny the answer to'the appeal.

FACTS AND PROCEDURAL HISTORY

Dr. Walker hired generál contractor Tracy Jordan, LLC to construct a home in the University Club Plantation subdivision in East Baton Rouge Parish.2 During the' construction process, Tracy Jordan, the owner of Tracy Jordan, LLC, contracted with Accusess to provide environmental permitting services that were required for the construction of Dr. Walker’s residential property. Specifically, Ac-cusess drafted a stormwater environmental report for the Environmental Division of the East Baton Rouge Parish Department of Public Works as a prerequisite for approval of a residential building permit for the property. Accusess also generated a state construction permit for residential construction as required by the Louisiana _ Department of Environmental Quality (“LDEQ”).

The labor furnished.-by Accusess in completing the application included a stormwa-ter pollution prevention plan (“SWPPP”), erosion control map, LDEQ Notice of Intent for Construction Permit application, stormwater inspections, and compliance reporting. Accusess submitted the finalized permit application to the LDEQ on October 6, 2009. The LDEQ granted the permit on March 4, 2010. Accusess began work for Mr. Jordan on September 22, 2009, and ended its work on July 15, 2010. After the work was complete, Accusess supplied Mr. Jordan lawith an invoice showing the total amount of $700.00 due for the professional labor and services it rendered.3 Mr. Jordan never paid the invoice. On July 5, 2010, Dr. Walker terminated Mr. Jordan from the' construction project.

Read the full text

This document is published by courtlistener.com.

Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.