Texas Court of Appeals, 13th District August 3, 2017, 13-16-00380-CV (Geoffrey Lucker v. Texas Department of Transportation)
Also known as
United States · · · 03-08-2017
NUMBER 13-16-00380-CV
COURT OF APPEALS
THIRTEENTH DISTRICT OF TEXAS
CORPUS CHRISTI – EDINBURG
GEOFFREY LUCKER, Appellant,
v.
TEXAS DEPARTMENT OF
TRANSPORTATION, Appellee.
On appeal from the 21st District Court of
Lee County, Texas.
MEMORANDUM OPINION
Before Justices Benavides, Longoria and Hinojosa
Memorandum Opinion by Justice Longoria
Appellant Geoffrey Lucker, the surviving husband of Sally Lucker, filed a derivative
premises liability suit against the Texas Department of Transportation (“the Department”)
after Sally died during a flood. The trial court signed a take-nothing judgment in favor of
the Department. Lucker argues in two issues that the trial court erred in submitting two
questions to the jury as part of the jury charge. We affirm.
I. BACKGROUND1
On March 20, 2012, the Department received information that water was likely to
flood a number of roads in Lee County and dispatched all available employees to respond
to the situation. Paul Meinke, an assistant maintenance supervisor for the Department,
was in charge of the Department’s response. Meinke testified that, beginning in the early
morning, he monitored flooding at different areas, including where FM 1624 crosses the
Middle Yequa Creek, the location where Sally was swept off. The water flowed under FM
1624 through a box culvert, referred to at trial as a “bridge.”
Throughout the day, Meinke put out a number of signs at different locations. One
of the signs Meinke placed prior to the accident was a large temporary “Watch For Water
On Road” sign, which also displayed two flags; the sign was placed next to a smaller,
permanent sign, with the same message, on the approach to the bridge later used by
Sally. The temporary sign was four feet by four feet in size, bright orange, and its flags
were red-orange in color. The permanent sign was yellow, and three feet by three feet in
size.
These signs were located about 2,500 feet from the bridge.
Read the full text
This document is published by courtlistener.com.
Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.
Sign in to Moonlit