District Court, S.D. Florida March 28, 2022, 0:19-cv-62225 (U.S. Structural Plywood Integrity Coalition v. PFS Corporation)

Also known as

United States · · · 28-03-2022

UNITED STATES DISTRICT COURT

SOUTHERN DISTRICT OF FLORIDA

CASE NO. 19-62225-CIV-ALTMAN

U.S. STRUCTURAL PLYWOOD

INTEGRITY COALITION,

et al.,

Plaintiffs,

v.

PFS CORPORATION, et al.,

Defendants.

___________________________________/

ORDER

If you want to build with plywood in the United States, you generally need a certification—

called a PS 1-09 stamp. The Plaintiffs are a coalition of ten American structural-plywood mills who

manufacture and sell their plywood in the United States. The Defendants are two companies that

inspect structural plywood and, if it conforms to the PS 1-09 standard, stamp the wood as PS 1-09-

compliant. According to the Plaintiffs, the Defendants have been certifying 36 Brazilian plywood mills

with the PS 1-09 stamp—even though the Defendants know (or should know) that the Brazilian wood

doesn’t comply with the PS 1-09 standard. In the Plaintiffs’ view, this sham certification process has

allowed the Brazilian mills to sell their cheaper, non-compliant wood all over the United States—thus

displacing the Plaintiffs’ stronger, better, more expensive products. In their complaint, the Plaintiffs

levy negligence and Lanham Act claims, which the Defendants have now moved to dismiss. This

Order follows.

THE POSTURE

The Defendants filed a Motion to Dismiss (the “Motion”) [ECF No. 182] the First Amended

Complaint [ECF No. 106]. The Plaintiffs responded [ECF No. 196]. And the Motion ripened when

the Defendants filed their Reply [ECF No. 202]. The Court held a hearing on the Motion, at which

the parties presented their oral arguments. At the hearing, the Court noted that the First Amended

Complaint fell into the most common form of shotgun pleading, see Amended Complaint ¶¶ 152, 160,

“where each count adopts the allegations of all preceding counts.” Weiland v. Palm Beach Cty. Sheriff’s

Off., 792 F.3d 1313, 1321 (11th Cir. 2015). After the Court ordered the Plaintiffs to remedy the error

[ECF No.

Read the full text

This document is published by courtlistener.com.

Moonlit adds the citation network, article-level links and cross-references, which are available to search for free.